From June 3rd 2020, the Children’s Railway will be operate again.

After the shutdown since 11 November 2020, scheduled train traffic between Hűvösvölgy and Széchenyihegy stations will resume on 3rd June 2021.

During the summer season, Children’s Railway operate every day of the week. Schedule: https://gyermekvasut.hu/en/timetables/

Újraindul a Gyermekvasút